
Construction Management
Construction Management
EPCPROMAN is a pioneer in providing unique IT solutions for EPC companies and all the disciplines and departments.
EPCPROMAN also provides a skilled manpower in various segments of the project like;
Material Management, Planning & Scheduling
Inventory Management and Tracking
Fabrication Control and Monitoring
Erection Monitoring
Test Pack and Work Packages Monitoring
On-Job Implementation Services
Piping Test Pack – Line Walkthrough Services

On-Job Implementation Services
Performing Look Ahead Planning analysis for forecasting resource requirement and to mobilise resources in time based on Engineering Schedule & Material ETA dates & Matching Front Analysis
Fabrication tracking & control at Pipe Fabrication Shops including Shop Job Card Creation, Shop Spool Material Issuance, Spool Front Release, Production Fit-up, Production Welding, Non Destructive Testing and Spool Clearance, Spool Painting, Spool Dispatch Clearance, Spool Issue Voucher Request, Shop Change Request (SCR) and Approval for Modifications.
Erection tracking & control at erection sites including Spool Receiving at Site, Site Job Card Creation, Erection Component Material Issuance, Erection Planning, Erection Fit-up, Erection Welding, Non Destructive Testing and Spool Clearance, Spool Erection, Erection Item Installation, Flange Joint Clearance, Punch Points, ISO Erection Clearance, Test Pack Construction Clearance, Field Change Request (FCR) and Approval for Modifications.
Piping Test Pack – Line Walkthrough Services
The service focuses on verifying drawings, joint details, site modifications, and preparing essential documentation required for smooth mechanical clearance and project execution.
Experienced Site Engineers are deployed for the Piping Test Pack Line Walkthrough in the projects involving the following activities
Performing Line Walk through before Mechanical Completion
Verifying the ISO Drawing Revision with respect to Test Package Limits
Verifying the joint summary with respect to test pack limits
As per site modification progress update in ISO drawing (supports modify joints)
Preparing as Built Drawings for further mechanical clearance process
Verifying ISO Revision status before MC
Reviewing test pack data before MC clearance
Checking joints/welds physically on-site location
Hand Sketch Drawing Preparation as per site progress
Preparing Joint summary list as per site progress
Trusted by Industry Leaders
Successful implementation of EPCPROMAN across major EPC projects in India

DEEPAK PHENOLICS PROJECT & CUMENE PROJECT
DEEPAK NITRITE
THYSSENKRUPP
Dahej, Gujarat
300,000 Inch-Diameter (approx.)
Successfully executed using EPCPROMAN software and Spool Tracking System for complete spooling, fabrication, erection, NDT, and project monitoring.
DEEPAK PHENOLICS project completed. CUMENE PROJECT in advanced stage of completion.
Modules Successfully Utilized

G3AU (GADGETAN 3 AMMONIA UREA) PROJECT
CHAMBAL FERTILIZERS
TOYO
Kota, Rajasthan
500,000 Inch-Diameter (approx.)
EPCPROMAN and Spool Tracking System implemented for spooling, material control, fabrication, erection, loop testing and progress monitoring.
Project progressing smoothly with strong digital tracking and control.
Modules Successfully Utilized
Global Project Footprint
EPCPROMAN successfully implemented across major industrial projects worldwide












Projects Executed
Overview of piping projects — scope, client details & delivery status
| SL No. | Organization | Project | Owner/Client | Discipline | Total Scope(Inch Dia) | Status |
|---|---|---|---|---|---|---|
| 1 | HYCO | HYCO Project, Kochi, India | Technip India Limited | Piping | 2,00,000 | Completed |
| 2 | HPCL Mittal Energy Ltd. | BS-VI Project, Bhatinda, Punjab India | HPCL Mittal Energy Ltd. | Piping | 2,00,000 | Completed |
| 3 | Salalah LPG SFZCO LLC | SALALAH LPG, Salalah, Oman | Petrofac Intl. Ltd. | Piping | 3,75,000 | Completed |
| 4 | BPCL | GTU Project: BPCL Mahul, Mumbai, India | BPCL | Piping | 2,00,000 | Completed |
| 5 | HYCO | HPCL Visakh Refinery, Vaizag, India | Technip India Limited | Piping | 1,90,000 | Completed |
| 6 | HPCL | HPCL Visakh Refinery, Vaizag, India | Petrofac Intl. Ltd. | Piping | 6,35,000 | Completed |
| 7 | ADNOC | QUSAHWIRA Field Development Phase-2, Abu Dhabi, UAE | Petrofac Intl. Ltd. | Piping | 4,65,000 | Completed |
| 8 | Sakhalin Energy Investment Company Ltd. | SAKHALIN-2 OPF Compression, Sakhalin, Russia | Petrofac Intl. Ltd. | Piping | 1,90,000 | Completed |
| 9 | BOC | MAJNOON CPF-2, Basra, Iraq | Petrofac Intl. Ltd. | Piping | 1,90,000 | Completed |
| 10 | Indian Oil Corporation Limited (IOCL) | Vacuum Gas Oil Hydro Treater Unit (VGO HDT) P-25 Expansion, Panipat, Haryana. | Toyo Engineering India Private Limited. | Piping | 3,31,868 | Final Stage |
| 11 | HPCL RAJASTHAN REFINERY LIMITED (HRRL) | VGO – VACUUM GAS OIL, PROJECT NO. 500052 | TATA PROJECTS LIMITED. | Piping | 3,50,000 | Completed |
| 12 | HPCL RAJASTHAN REFINERY LIMITED (HRRL) | DCU – DELAYED COKER UNIT 500053 | TATA PROJECTS LIMITED. | Piping | 5,10,000 | Completed |
| 13 | HPCL RAJASTHAN REFINERY LIMITED (HRRL) | CDU VDU (CRUDE DISTILLATION UNIT & VACUUM DISTILLATION UNIT) 500051 | TATA PROJECTS LIMITED. | Piping | 7,50,000 | Initiated |
| 14 | INDIAN OIL CORPORATION LIMITED | MS BLOCK | TATA PROJECTS LIMITED. | Piping | 3,12,089 | On-Going |