Hero background

Construction Management

Construction Management

  • EPCPROMAN is a pioneer in providing unique IT solutions for EPC companies and all the disciplines and departments.

  • EPCPROMAN also provides a skilled manpower in various segments of the project like;

  • Material Management, Planning & Scheduling

  • Inventory Management and Tracking

  • Fabrication Control and Monitoring

  • Erection Monitoring

  • Test Pack and Work Packages Monitoring

  • On-Job Implementation Services

  • Piping Test Pack – Line Walkthrough Services

Construction Management

On-Job Implementation Services

  • Performing Look Ahead Planning analysis for forecasting resource requirement and to mobilise resources in time based on Engineering Schedule & Material ETA dates & Matching Front Analysis

  • Fabrication tracking & control at Pipe Fabrication Shops including Shop Job Card Creation, Shop Spool Material Issuance, Spool Front Release, Production Fit-up, Production Welding, Non Destructive Testing and Spool Clearance, Spool Painting, Spool Dispatch Clearance, Spool Issue Voucher Request, Shop Change Request (SCR) and Approval for Modifications.

  • Erection tracking & control at erection sites including Spool Receiving at Site, Site Job Card Creation, Erection Component Material Issuance, Erection Planning, Erection Fit-up, Erection Welding, Non Destructive Testing and Spool Clearance, Spool Erection, Erection Item Installation, Flange Joint Clearance, Punch Points, ISO Erection Clearance, Test Pack Construction Clearance, Field Change Request (FCR) and Approval for Modifications.

Piping Test Pack – Line Walkthrough Services

  • The service focuses on verifying drawings, joint details, site modifications, and preparing essential documentation required for smooth mechanical clearance and project execution.

  • Experienced Site Engineers are deployed for the Piping Test Pack Line Walkthrough in the projects involving the following activities

  • Performing Line Walk through before Mechanical Completion

  • Verifying the ISO Drawing Revision with respect to Test Package Limits

  • Verifying the joint summary with respect to test pack limits

  • As per site modification progress update in ISO drawing (supports modify joints)

  • Preparing as Built Drawings for further mechanical clearance process

  • Verifying ISO Revision status before MC

  • Reviewing test pack data before MC clearance

  • Checking joints/welds physically on-site location

  • Hand Sketch Drawing Preparation as per site progress

  • Preparing Joint summary list as per site progress

Trusted by Industry Leaders

Successful implementation of EPCPROMAN across major EPC projects in India

DEEPAK PHENOLICS PROJECT & CUMENE PROJECT
Completed & Advanced Stage

DEEPAK PHENOLICS PROJECT & CUMENE PROJECT

OWNER

DEEPAK NITRITE

PMC

THYSSENKRUPP

LOCATION

Dahej, Gujarat

SCOPE

300,000 Inch-Diameter (approx.)

Successfully executed using EPCPROMAN software and Spool Tracking System for complete spooling, fabrication, erection, NDT, and project monitoring.

DEEPAK PHENOLICS project completed. CUMENE PROJECT in advanced stage of completion.

Modules Successfully Utilized

AUTOSPOOLSPOOLMANERMANSPOOL TRACKINGSTOREMAN
G3AU (GADGETAN 3 AMMONIA UREA) PROJECT
Ongoing (25% Fabrication • 5% Erection Completed)

G3AU (GADGETAN 3 AMMONIA UREA) PROJECT

OWNER

CHAMBAL FERTILIZERS

PMC

TOYO

LOCATION

Kota, Rajasthan

SCOPE

500,000 Inch-Diameter (approx.)

EPCPROMAN and Spool Tracking System implemented for spooling, material control, fabrication, erection, loop testing and progress monitoring.

Project progressing smoothly with strong digital tracking and control.

Modules Successfully Utilized

AUTOSPOOLSPOOLMANERMANSPOOL TRACKINGSTOREMAN
EPCPROMAN + Spool Tracking System delivered superior project visibility, control, and efficiency in all projects

Global Project Footprint

EPCPROMAN successfully implemented across major industrial projects worldwide

HYCO Project – Kochi, India
BS-VI Project – Bhatinda, Punjab
Salalah LPG Project – Oman
GTU Project – India
HPCL Visakh Refinery – India
HPCL Refinery – Vizag, India
Qusahwira Field – Abu Dhabi
Sakhalin-2 OPF – Russia
Majnoon CPF – Iraq
VGO Project – Barmer, Rajasthan
DCU Project – Barmer, Rajasthan
Barmer Refinery Expansion – India

Projects Executed

Overview of piping projects — scope, client details & delivery status

SL No.1
OrganizationHYCO
ProjectHYCO Project, Kochi, India
Owner/ClientTechnip India Limited
DisciplinePiping
Total Scope(Inch Dia)2,00,000
StatusCompleted
SL No.2
OrganizationHPCL Mittal Energy Ltd.
ProjectBS-VI Project, Bhatinda, Punjab India
Owner/ClientHPCL Mittal Energy Ltd.
DisciplinePiping
Total Scope(Inch Dia)2,00,000
StatusCompleted
SL No.3
OrganizationSalalah LPG SFZCO LLC
ProjectSALALAH LPG, Salalah, Oman
Owner/ClientPetrofac Intl. Ltd.
DisciplinePiping
Total Scope(Inch Dia)3,75,000
StatusCompleted
SL No.4
OrganizationBPCL
ProjectGTU Project: BPCL Mahul, Mumbai, India
Owner/ClientBPCL
DisciplinePiping
Total Scope(Inch Dia)2,00,000
StatusCompleted
SL No.5
OrganizationHYCO
ProjectHPCL Visakh Refinery, Vaizag, India
Owner/ClientTechnip India Limited
DisciplinePiping
Total Scope(Inch Dia)1,90,000
StatusCompleted
SL No.6
OrganizationHPCL
ProjectHPCL Visakh Refinery, Vaizag, India
Owner/ClientPetrofac Intl. Ltd.
DisciplinePiping
Total Scope(Inch Dia)6,35,000
StatusCompleted
SL No.7
OrganizationADNOC
ProjectQUSAHWIRA Field Development Phase-2, Abu Dhabi, UAE
Owner/ClientPetrofac Intl. Ltd.
DisciplinePiping
Total Scope(Inch Dia)4,65,000
StatusCompleted
SL No.8
OrganizationSakhalin Energy Investment Company Ltd.
ProjectSAKHALIN-2 OPF Compression, Sakhalin, Russia
Owner/ClientPetrofac Intl. Ltd.
DisciplinePiping
Total Scope(Inch Dia)1,90,000
StatusCompleted
SL No.9
OrganizationBOC
ProjectMAJNOON CPF-2, Basra, Iraq
Owner/ClientPetrofac Intl. Ltd.
DisciplinePiping
Total Scope(Inch Dia)1,90,000
StatusCompleted
SL No.10
OrganizationIndian Oil Corporation Limited (IOCL)
ProjectVacuum Gas Oil Hydro Treater Unit (VGO HDT) P-25 Expansion, Panipat, Haryana.
Owner/ClientToyo Engineering India Private Limited.
DisciplinePiping
Total Scope(Inch Dia)3,31,868
StatusFinal Stage
SL No.11
OrganizationHPCL RAJASTHAN REFINERY LIMITED (HRRL)
ProjectVGO – VACUUM GAS OIL, PROJECT NO. 500052
Owner/ClientTATA PROJECTS LIMITED.
DisciplinePiping
Total Scope(Inch Dia)3,50,000
StatusCompleted
SL No.12
OrganizationHPCL RAJASTHAN REFINERY LIMITED (HRRL)
ProjectDCU – DELAYED COKER UNIT 500053
Owner/ClientTATA PROJECTS LIMITED.
DisciplinePiping
Total Scope(Inch Dia)5,10,000
StatusCompleted
SL No.13
OrganizationHPCL RAJASTHAN REFINERY LIMITED (HRRL)
ProjectCDU VDU (CRUDE DISTILLATION UNIT & VACUUM DISTILLATION UNIT) 500051
Owner/ClientTATA PROJECTS LIMITED.
DisciplinePiping
Total Scope(Inch Dia)7,50,000
StatusInitiated
SL No.14
OrganizationINDIAN OIL CORPORATION LIMITED
ProjectMS BLOCK
Owner/ClientTATA PROJECTS LIMITED.
DisciplinePiping
Total Scope(Inch Dia)3,12,089
StatusOn-Going