PROPLAN
Project Activity Network Scheduling, Resources, Documents, Quantity Monitoring
PROPLAN Overview
PROPLAN is a project planning and scheduling software that helps you to plan, schedule, control, and monitor the detailed-level activities of various project functions, including:
PROPLAN bridge a gap between planning and execution by merging network logic, forecast intelligence and resource foresight ensuring project team to stay ahead of the problems before they arise.
Project Network Scheduling
It uses Critical path Method and precedence Diagram Technique. It allows WBS based creation of activity networks identifying the dependency and float.
Forecast & Progress Tracking
Track real time earned values, Plan vs. Actual and Schedule variance. Display S-curves and trend analysis Charts.
Resource Forecasting
Anticipate the resources, cost and time to complete the activity within time by using Cost & Schedule Performance Index.
Features of PROPLAN
CPM-based Project Scheduling
Develop project network schedules with resource loading across multiple levels. Generate critical paths at unit or complex levels and trigger alerts when delays occur in critical activities or when non-critical activities become critical due to delays.
Dynamic Look-Ahead Planning
Create dynamic schedules such as 30-day or 90-day look-ahead plans with corresponding resource requirements and forecasts to anticipate upcoming project activities.
Cost Control & Forecasting
Monitor, report, and control project costs at activity and unit/complex levels with scenario-based forecasting and graphical or tabular reporting.
Progress Tracking & File Comparison
Calculate percentage progress at activity, unit, and complex levels and compare updated project files with baseline schedules for variance analysis.
4D Scheduling & Model Integration
Integrate activity schedules with IFC 3D models for 4D (3D + time) scheduling, enabling visualization and tracking of critical construction activities using standard review tools.
Benefits of PROPLAN
Advanced Planning & Forecasting
Improves accuracy in project planning and forecasting while enabling efficient identification of critical paths and proactive delay mitigation strategies.
Enhanced Project Control & Visibility
Provides detailed monitoring, enhanced visibility, and complete control over project progress to support better decision-making.
Optimized Resources & Risk Reduction
Ensures optimal resource allocation and utilization while reducing risks related to delays and cost overruns.
Collaboration & System Integration
Improves team communication and collaboration with seamless integration support for Oracle Primavera®, Microsoft Project®, and Microsoft Excel®.
Watch PROPLAN in Action
See how PROPLAN helps project teams plan, schedule, and control complex EPC projects with powerful visualization and forecasting.


Why PROPLAN
| S.No | Other Network Systems | PROPLAN |
|---|---|---|
| 1 | Activity based Scheduling Tools | Activity as well as Quantity based Scheduling Tool with Resource Loading |
| 2 | Assessment of Resources is inaccurate for the Activity. | Assessment of Resources is accurate for the estimated quantity. |
| 3 | Creation of Resource Gang is not possible | Creation of Resource Gang is possible |
| 4 | Assessment of %age Progress is inaccurate due Activity monitoring. | Assessment of %age Progress is accurate due to Quantity level monitoring. |
| 5 | Rolling up %age Progress of various Functions & Overall is not possible. As a result, %age Progress is calculated in Excel. | Rolling of %age Progress at Unit as well as Overall levels is possible. Need not to switch over to Excel. |
| 6 | Calculation of Work Fronts particularly for Construction works not possible. | Calculation of Work Fronts is possible w.r.t Drg., Matl. & Access |
| 7 | Work Front Forecast is not possible. | Work Front Forecast can be made for advance resource planning. |
| 8 | Integration with Auto Spooling Software is not possible. | Integration of Auto Spooling is possible. Progress calculation / Reporting of Piping work is exceptionally accurate. |
| 9 | Look ahead Schedule is inaccurate due to monitoring at Activity level only. | Look ahead Schedule is accurate due to monitoring of Quantity against the Activity. |
| 10 | Look ahead Forecasts for various scenarios is not possible. | Look ahead Forecasts for various scenarios is simple using curves. |
| 11 | Window Analysis is not up to the mark due to Activity level monitoring. | Window Analysis is accurate to a great extent due to Quantity level monitoring. |
| 12 | Not easily customizable. | Can be customized without taking much time. |
| 13 | Not user friendly. Lot of roaming. | User friendly. Roaming avoided. |
| 14 | Cost of Software and AMC is too high. | Cost of Software and AMC is standard and affordable. |
See The PROPLAN in Action
Schedule a personalized demo with our team and see PROPLAN in action.